Ahmedabad-Dholera Expressway construction 95% complete; CM reviews progress of Dholera SIR
May 02, 2025
Gandhinagar: Chief Minister Bhupendra Patel today visited Dholera to personally assess the progress of development works at Dholera SIR, including the Smart City project, which is being developed with world-class infrastructure. He also held a review meeting in Dholera to evaluate the progress of key projects.
Dr Kuldeep Arya, CEO of Dholera SIR and MD of Dholera Industrial City Development Limited, presented a detailed presentation to the Chief Minister, Chief Secretary, and senior secretaries.
The presentation described that 95% of the Ahmedabad-Dholera Expressway has been completed, along with significant advancements in other major infrastructure projects. After reviewing the updates and remaining tasks, the Chief Minister provided guidance to ensure the projects were completed on time and met the highest quality standards, said a press note.
All infrastructure facilities, including roads, underground facilities, and plug-and-play infrastructure, have been completed in Dholera. Essential facilities such as the water treatment plant, sewage treatment plant, common effluent treatment plant, ICT infrastructure, and the ABCD building have also been completed, along with a 300 MW solar park, as mentioned by Dr Kuldeep Arya while providing a detailed update to the Chief Minister.
The presentation also covered ongoing projects at Dholera SIR, including the Bhimnath-Dholera freight railway line, a 192-bed hospital, a school up to 12th standard, a fire station, and residential facilities for investors. The state government is working to develop Dholera Smart City into a ‘Semicon City’ as part of this initiative, a semiconductor manufacturing ecosystem is being developed within Dholera Smart City, with both national and international semiconductor manufacturing companies establishing their units there. Around 12 project developers working at Dholera SIR presented updates on their project progress and future roadmap, including construction details, to the Chief Minister.
The Chief Minister also reviewed the progress of the Tata Electronics semiconductor plant being set up in Dholera Semicon City. During his visit, he met with Tata officials to evaluate the construction progress of the plant and toured the facility. Additionally, the Chief Minister inspected various ongoing construction projects within Dholera Semicon City, including the hospital, school, fire station, residential complex, tent city, and food court. Chief Minister Bhupendra Patel also visited the Dholera International Airport to review the ongoing construction of the cargo building, terminal building, and runway, being developed at an estimated cost of ₹1,350 crore. DeshGujarat
Recent Stories
- UGVCL announces scheduled power cuts in Mehsana and Palanpur of North Gujarat
- Gujarat Police bust drug racket targeting students of top colleges in Ahmedabad
- Chandola demolition to resume in phased manner; survey, wall construction, power cut next
- 150 MW Gujarat solar project of NTPC becomes fully operational
- Fire breaks out at Venus Atlantis building in Prahladnagar, Ahmedabad
- IMD predicts unseasonal rain in these parts of Gujarat from May 3
- Gujarat Leads in Castor Oil Cultivation for 4th Decade with 6.46 Lakh Hectares in 2024-25