Surat Railway Station Platform 1 to Shut for 80 Days; 89 Trains to Halt at Udhna, 50 at Utran
November 23, 2026
Surat: Platform No. 1 at Surat Railway Station will remain closed for 80 days as part of Phase IV of the station redevelopment project, during which foundation work, structural construction, and the installation of concourse beams and columns will be carried out. The prolonged closure, starting in December, is expected to affect train operations and inconvenience thousands of passengers travelling to and from Surat.
According to the railway’s plan, the first 10 days will be spent removing shops, advertisement boards, electrical equipment and other facilities from the platform. Subsequently, barricading will be installed, followed by the demolition of the existing platform shed, roof and other structures.
While Platform No. 1 will remain closed to passengers throughout the construction period, train movement on Line No. 1 will continue under a speed restriction of 20 kmph.
The biggest impact will be on train stoppages. According to railway plans, 89 trains will halt at Udhna instead of Surat, while 50 trains will have their stoppages shifted to Utran. Additionally, 25 trains heading towards Ahmedabad will also halt at Udhna instead of Surat.
Around 44 trains will continue to halt at Surat. Meanwhile, approximately 25 trains that currently stop at both Surat and Udhna will halt only at Udhna, skipping Surat station.
The changes are likely to affect daily commuters, office-goers, traders, students and passengers travelling out of Surat. Commuters from different parts of the city will have to spend additional time reaching Udhna or Utran stations. Passengers travelling at night and those travelling with families may also face inconvenience due to the altered boarding and deboarding arrangements.
As per the railway’s plan, select trains, including premium services, will continue to stop at Surat. Changes will also be made to the operations of short-distance trains originating from or terminating at Surat and other stations.
The redevelopment work is aimed at modernising Surat Railway Station, but the 80-day construction period will significantly alter passenger movement and train operations at one of the city’s major railway hubs.
Passengers are advised to check revised train stoppages and schedules before booking tickets and leaving for the station, as Udhna and Utran are expected to serve as alternative boarding and deboarding points for many trains during the redevelopment work. DeshGujarat
Recent Stories
- Illegal Houses of Drug Peddlers Razed in Ahmedabad
- Priest Held for Stealing 9 Kg Silver Ornaments from Jain Derasar in Ahmedabad
- WhatsApp Web Security Alert: MHA Warns Users Against Sharing Confidential Information
- Railways Target Two-Way Freight Connectivity Between Gujarat, Punjab and Haryana
- Diljit Dosanjh Ahmedabad Concert: Duo Buys Gold Tickets to Steal High-End Phones; Nabbed
- Gujarat-Based NFSU, RRU Ink MoUs with Nepal to Boost Forensics, Security Cooperation
- 800 AMTS Bus Stops to Be Modernised With Smart Amenities, GPS-Based Tracking
- Mobile Phone Parcels Stolen, Swapped With Cardboard Rolls; Delivery Boy Booked in Ahmedabad
- Two Gujarat Pilgrims Killed in Bus Accident Near Shikharji in Jharkhand; 12 Injured
- Gujarat to have Special Voter Registration Camps on three Sundays
- Gujarat Sees Rise in Night Temperatures; Ahmedabad Minimum 2.9°C Above Normal
