Akota – Dandia Bazar solar bridge project likely to complete in a month
December 17, 2020
Vadodara: Solar panel laying work over Akota – Dandiya Bajar bridge in Vadodara has been comleted. The entire project will be completed in next one month after installation of compact substation is over. In all, 3,024 solar panels have been laid over this 220 meter long bridge. Expected generation of power through this arrangement will be 3,000 to 4,000 units per day and 14.35 lakh units annually that may result into saving of Rs. 1 crore power bill for Vadodara Municipal Corporation (VMC). A 983 kw capacity solar generation facility has been set up at a cost of Rs. 11.36 crore. VMC will transfer solar power generated to Madhya Gujarat Vij Company Ltd (MGVCL) and get rebate on MGVCL electricity bills. DeshGujarat
Related Stories
A solar bridge in Vadodara generates Rs. 50 lakh worth power in 9 months
Vadodara gets rooftop solar power plant over Akota - Dandiya Bazar bridge
Recent Stories
- Gujarat ACB nabs CGST inspector in bribe case
- Gujarat has second-lowest unemployment rate in country in PLFS 2023-24; state-wise data here
- State run DISCOMs in Gujarat cut debt by Rs 1,195 Crore in 7 years
- Massive Hindu Gathering at Mahakumbh in Prayagraj: Over 20 Crore Expected, Says VHP Leader
- Upto 935% hike in UDF charges for passengers at Ahmedabad airport in 3 years
- Construction of rubber barrage-cum-bridge over Sabarmati River begins
- Accident on Ahmedabad-Mumbai National Highway 48 in Kosamba: 1 dead, several injured