Works kick off for a Mango shaped Bilimora bullet train station
July 12, 2021
Navsari: A mango shaped Bilimora Station for the Bullet Train project will be constructed in Kesali village of Navsari as it is a horticulture area producing mangoes.
The station will be built in an area of 12 hectares. The work of soil testing and pile casting for rail track which will at 12 metres height has been started. The bullet train between Ahmedabad and Bombay will pass through 28 village sides in Navsari district in the length of 37 km.
It will pass through the villages such as Asna, Dabhel, Dhaman, Vejalpor, Parthan, Padgha, Amri, Amadpor, Dharagiri, Virvadi, Nasilpor, Sisodara, Kachhol, Khadsupa, Ichchhapor, Pinjra, Manekpor, Pathri, Dhanori, Vadsagan, Khergam, Desad, Pati, Kesali, Nadrakha, Undach, Vankal, Ghekti. DeshGujarat
Recent Stories
- Foreign student of Parul University held for assaulting elderly, extorting money; cops also attacked
- Kutch Rann Utsav 2024 begins; lakhs of visitors to experience tent city, light & sound show, and more till Feb 28
- Coldplay’s biggest-ever show to be held at Narendra Modi Stadium in Ahmedabad; Tickets on sale Nov 16
- Pensioners can now obtain Digital Life Certificate at nearest post office
- 85-foot lion-shaped Durga Mandir to be built near Nala Sarovar
- Sabarmati Riverfront likely to get another river cruise
- SGCCI urges Western Railway to reinstate Andheri halt for superfast trains to ease airport access