Sabarmati over bridge to remain shut for repair during 4-6 November
November 04, 2023
Sabarmati: Sabarmati overbridge near the power station will be shut for traffic after the England-Australia World cricket match, till November 6 for repair and road surfacing. The road was to shut from 3rd November, however, due to the cricket match nearby at Motera stadium, the bridge will now be shut for repair after the match is over.
The bridge connects Sabarmati to the RTO circle. It will be shut from the night of 4 November to 9 am on 6t November. The repair works include resurfacing using the milling method and patchwork. Commuters are asked to use alternative routes in the absence of this stretch. The repair works will be executed by the Amdavad Municipal Corporation(AMC). The bridge is located over the Ahmedabad-Delhi main railway line, close to Sabarmati railway station and Torrent power station. DeshGujarat
Recent Stories
- Fire breaks out in CNG fueled BRTS bus in Ahmedabad
- PhD student from IIT Delhi dies in Lothal, Gujarat during research work
- GSI surveys in Gujarat for minerals, including gold, yield no positive outcome
- Gujarat ACB nabs CGST inspector in bribe case
- Gujarat has second-lowest unemployment rate in country in PLFS 2023-24; state-wise data here
- State run DISCOMs in Gujarat cut debt by Rs 1,195 Crore in 7 years
- Massive Hindu Gathering at Mahakumbh in Prayagraj: Over 20 Crore Expected, Says VHP Leader