Some exciting updates from the Statue of Unity site
January 22, 2016
Bharuch
There are some good developments to share from the Statue of Unity construction site at Kevadia colony in central Gujarat.
Over 80% rebar cutting and bending works for the Statue of Unity’s main raft foundation has been completed on site. More than 60% of rebar lying works and over 50% of formwork for the main raft are also been completed.
The works involved a 3-meter deep raft foundation of the Statue of Unity with round-the-clock concreting over few days to ensure a safe bearing capacity.
All concreting work for the confinement wall being built around Sadhu Bet will be completed by February, 2016.
Before construction work on the feet of the Statue of Unity begins next year, the construction of the main bridge connecting the statue to the Narmada bak as well as the road along the bank leading to Sadhu bet will be completed.
The museum and memorial park of the Statue of Unity will be completed before the construction of the feet of the statue begins next year. The project is progressing on schedule and will be completed by 2018.
– DeshGujarat
Related Stories
Gujarat CM to mark starting raft concreting work at Statue of Unity
School children unveil Sardar Patel’s 30-foot replica of Statue of Unity
More clarity on Chinese contribution to making of Statue of Unity
Progress of Statue of Unity project
Padmashri Ram Sutar as designer and sculptor of Statue of Unity
30 ft replica of Statue of Unity unveiled at Baben in Bardoli
Phase I work of 'Statue of Unity' project underway: Gujarat CM
Gujarat Budget: Rs. 468 crore 4-lane road connecting Vadodara and Ankleshwar to Statue of Unity
Geologists conduct soil/rock testing for foundation work of Statue of Unity
M.Venkaiah Naidu unveils Bronze Statue of Sardar Patel
1.5 lakh kits for Statue of Unity arrive at SSNNL Vadodara godown
L&T to build Rs. 2,989 crore Statue of Unity in 4 years: Gujarat CM
Statue of Unity construction from 31 October: report
In pictures/video: Narendra Modi launches a film on 'Statue of Unity'
Narendra Modi to launch Statue of Unity video at Gujarat University
Statue of Unity: Gujarat delegation meets Jharkhand CM Hemant Soren, cricketer Dhoni's family
Gujarat ministers to visit various states for Statue of Unity project
Gujarat CM lays foundation stone of world’s tallest 182-mt statue of Sardar Patel – Statue of Unity – near Sardar Sarovar dam
Modi's some of the super shots at Statue of Unity stone laying function(video)
The campaign to collect iron tools for Statue of Unity from December 15:Narendra Modi
Technical drawings of Statue of Unity and some more details
LK Advani to be the Chief Guest of Statue of Unity function
Governor opens new website of Statue of Unity
A new picture of proposed Statue of Unity
Tender process for 'Statue of Unity' likely to start next month
Metro Rail, 6-lane highway to connect Vadodara with Statue of Unity:Modi
Rs. 55 crore received as donation for 'Statue of Unity'
Modi wants speedy progress of work for the Statue of Unity(Video)
Modi announces 'Statue of Unity' project near Narmada dam(Video)
Recent Stories
- Valsad college girl rape and murder case detected; Accused turns out to be a serial killer
- Shamlaji mandir laser light and sound show formally inaugurated
- Attack on Sardardham Vice President; Khodaldham fame Naresh Patel's involvement alleged
- Doctors of Adani-run G.K. General Hospital in Bhuj go on strike
- District collectors of Bharuch, Vadodara, Narmada supporting sand mafias, alleges MP Mansukh Vasava
- One side of Shastri Bridge in Ahmedabad to shut for repair work
- Surat's first indoor sports facility center to be built under Parle Point bridge