Articles tagged under: Expressway

Key Highlights of Gujarat’s Infrastructure Push in February 2026

March 04, 2026
Key Highlights of Gujarat’s Infrastructure Push in February 2026

Ahmedabad: February 2026 witnessed a series of major announcements and developments related to infrastructure, industry and economic growth in Gujarat, coinciding with the presentation of both the Union Budget and the Gujarat State Budget. Several projects progressed from planning to execution, while new initiatives were announced across sectors including transport, energy, healthcare, urban development and industry. Infrastructure and Industry Developments One of the most significant milest...Read More

₹3,800 Crore Push for Expressways, Garvi Gujarat High-Speed Corridor in Budget 2026

February 18, 2026
₹3,800 Crore Push for Expressways, Garvi Gujarat High-Speed Corridor in Budget 2026

Gandhinagar: The Gujarat Budget for 2026–27 has announced a series of major initiatives aimed at developing and strengthening road and expressway infrastructure across the state, with a total allocation of ₹29,709 crore made to the Road and Building Department. Expressways and High-Speed Corridors The state is set to accelerate major projects with an additional provision of ₹3,000 crore for the Namo Shakti Expressway and Somnath–Dwarka Expressway. These projects are designed to conne...Read More

Ahmedabad–Vadodara Expressway NE1 Expansion to Six Lanes ; NHAI Floats Tender for DPR

February 14, 2026
Ahmedabad–Vadodara Expressway NE1 Expansion to Six Lanes ; NHAI Floats Tender for DPR

New Delhi: The National Highways Authority of India (NHAI) has issued a tender for appointing a consultancy firm to prepare a Detailed Project Report (DPR) for the proposed six-laning of the Ahmedabad–Vadodara Expressway (NE-1) in Gujarat. This Expressway currently features two lanes on each side, along with a service lane. According to the Notice Inviting Tender issued by the NHAI headquarters in New Delhi on February 12, 2026, the DPR will cover the entire 93.302-km stretch of the express...Read More

NHAI invites bids for 105-km stretch of Tharad–Ahmedabad expressway

February 01, 2026
NHAI invites bids for 105-km stretch of Tharad–Ahmedabad expressway

New Delhi: The National Highways Authority of India (NHAI) has invited bids for the construction of a six-lane, access-controlled greenfield highway in Gujarat under Package 1 of the Tharad–Ahmedabad Expressway. The package has a design length of 105.8 km, accounting for nearly half of the proposed Tharad–Deesa–Mehsana–Ahmedabad National High-Speed Corridor, which received Union government approval in August 2024. The tender for Package 1 covers a stretch from Km 0.000 to Km 105.8 and ...Read More

Vlogger travels from Ratlam to Vadodara by road on unfinished Delhi-Mumbai Expressway; What did he experience?

January 22, 2026
Vlogger travels from Ratlam to Vadodara by road on unfinished Delhi-Mumbai Expressway; What did he experience?

Ahmedabad: A travel vlogger’s road journey from Ratlam in Madhya Pradesh to Vadodara in Gujarat and onward to Navsari via the under-construction Delhi–Mumbai Expressway has highlighted the on-ground conditions, construction progress and teething issues in one of India’s most ambitious infrastructure projects. In a recently uploaded YouTube video, the vlogger documented his drive across multiple partially operational stretches of the expressway, offering real-time updates on entry points, ...Read More

Road resurfacing slows traffic on Ahmedabad–Vadodara Expressway; motorists advised to start early

January 21, 2026
Road resurfacing slows traffic on Ahmedabad–Vadodara Expressway; motorists advised to start early

Ahmedabad: Road repair and resurfacing work has been underway for the past 20 days on a 39-km stretch on the Vadodara-to-Ahmedabad side of National Expressway 1 (NE1), leading to slow-moving traffic and frequent congestion. During daytime hours, vehicles are allowed to pass through work zones in a single lane at reduced speeds, causing traffic snarls. Officials say the post-monsoon repairs include the removal of potholes and complete resurfacing of affected sections, and the work is expected to ...Read More

Toll rates for NE-1 to Moti Naroli (Kim), Ena, Gandeva and return on Delhi Mumbai Expressway fixed

January 14, 2026
Toll rates for NE-1 to Moti Naroli (Kim), Ena, Gandeva and return on Delhi Mumbai Expressway fixed

Surat: National Highway Authority of India (NHAI) has fixed the toll rates for Ena, Moti Naroli, Gandeva toll booths on Delhi - Mumbai Expressway as the stretches connecting Kim (Moti Naroli), Ena and Gandeva has been opened for vehicles. For cars-vans-jeeps-SUVs Gandeva to Ena will cost Rs. 80 and to Moti Naroli(Kim) will cost Rs. 175 toll. For journey to NE-1(Vadodara-Ahmedabad Expressway), Rs 480 toll tax will be payable. From Ena to Gandeva Rs. 80 toll tax will be applicable, so as R...Read More

Gujarat to propose widening of Ahmedabad–Vadodara Expressway to eight lanes

January 07, 2026
Gujarat to propose widening of Ahmedabad–Vadodara Expressway to eight lanes

New Delhi: The Gujarat government is set to request the union government to expand the Ahmedabad–Vadodara Expressway (NE-1) from the existing four/six lanes to eight lanes corridor in a bid to strengthen road infrastructure and improve commuter safety. The proposal is expected to be placed before the two-day Transport Development Council (TDC) meeting beginning in New Delhi, chaired by Union Road Transport and Highways Minister Nitin Gadkari. State transport ministers, principal secretaries, ...Read More

Delhi-Mumbai Expressway: Opening of Kim-Ankleshwar section delayed, to take few more days

January 01, 2026
Delhi-Mumbai Expressway: Opening of Kim-Ankleshwar section delayed, to take few more days

Surat: The Kim–Ankleshwar stretch, i.e. Package-5 of the Vadodara–Virar section of the Delhi–Mumbai Expressway, which was slated to be opened to the public on December 31, has been delayed once again and may now open ahead of Uttarayan. Ahead of the final opening, the National Highways Authority of India (NHAI) conducted inspections of the road stretch between Dahegam and Kim on December 30 and 31. Officials said the opening was deferred on December 31 as road marking work, along with the...Read More

Centre approves Nashik-Akkalkot 6-lane greenfield corridor; to connect with Delhi-Mumbai Expressway

December 31, 2025
Centre approves Nashik-Akkalkot 6-lane greenfield corridor; to connect with Delhi-Mumbai Expressway

New Delhi: The Cabinet Committee on Economic Affairs, chaired by the Prime Minister Narendra Modi, today has approved the construction of a 6-lane greenfield access-controlled Nashik–Solapur–Akkalkot Corridor in the State of Maharashtra on BOT (Toll) mode, with a project length of 374 km and a total capital cost of Rs 19,142 crore. This project will provide connectivity to important regional cities such as Nashik, Ahilyanagar, and Solapur, connecting to Kurnool, as indicated in the map. This...Read More