Articles tagged under: Nuclear Power

Through fusion process energy needs of 10 billion people can be fulfilled for 100 million years with available water and Lithium alone: DG ITER Dr Bernard Bigot in Gujarat

October 22, 2018
Through fusion process energy needs of 10 billion people can be fulfilled for 100 million years with available water and Lithium alone: DG ITER Dr Bernard Bigot in Gujarat

Gandhinagar: Director General of the International Thermonuclear Experimental Reactor (ITER), being built in France with the help of 35 countries including US, EU, Russia, Japan, China, Korea and India to explore the possibility of making fusion, the process with which sun and stars produce energy, happen in guided and artificial manner to meet the energy requirements of the world, Dr Bernard Bigot today said that with such a process the life time energy requirements of a human being can be fulf...Read More

Unit of Kakrapar Atomic Power Station functional again after over two years

September 19, 2018
Unit of Kakrapar Atomic Power Station functional again after over two years

Surat: Unit  of Kakrapar Atomic Power Station(KAPS) which was non functional for last over two years due to leakage has now achieved criticality and resumed nuclear fission chain reaction in reactor at full capacity. 220 MWe KAPS  unit achieved criticality at 2.22 am on Monday after fulfilling all procedures as per the prescribed norms and procedures. Unit  was non functional since March 2016 due to heavy coolant water leakage incident following which both reactors had stop functioning. Proce...Read More

Modi to visit Tokyo; Japan, India to sign nuclear deal in November, says a report

October 01, 2016
Modi to visit Tokyo; Japan, India to sign nuclear deal in November, says a report

TOKYO: Japan and India are likely to sign a civil nuclear cooperation pact during Indian Prime Minister Narendra Modi’s visit to Japan scheduled to take place in mid-November, the Mainichi newspaper reported on Saturday. The governments of Asia’s second-and third-largest economies are leaning toward holding a summit meeting between Modi and his Japanese counterpart Shinzo Abe, the report said, citing unidentified diplomatic sources from both nations. The signing of the civil nuclear co...Read More

Kudankulam plant I dedicated jointly by Modi, Putin, Jaya

August 10, 2016
Kudankulam plant I dedicated jointly by Modi, Putin, Jaya

Kudankulam (TN):Prime Minister Narendra Modi, Russian President Vladimir Putin and Tamil Nadu Chief Minister J Jayalalithaa today jointly dedicated to the nation the 1,000 MW Nuclear Power Plant-I here, assuring it was one of the safest atomic plants in the world. Speaking on the occasion through video conferencing from New Delhi, Modi said Kudankulum 1, an Indo-Russian project, was an important addition to the continuing efforts to scale up production of clean energy in India. "I have...Read More

Kakrapar atomic power station may take 3-8 months to recover

April 15, 2016

New Delhi The Kakrapar Atomic Power Station (KAPS) unit 1 in Gujarat, which has been shutdown since March due to radioactive leak, may still take nearly 3-8 months for full recovery. Sources said that Atomic Energy Regulatory Board (AERB), the watchdog of the Indian nuclear sector, is investigating the matter. But a senior Nuclear Power Corporation of India Ltd (NPCIL) official said the plant, which is near Surat, may take around 7-8 months to become fully operational. Kakrapar Ato...Read More

India, France sign MoU for construnction of 6 nuke reactors at Jaitapur

March 23, 2016

New Delhi India and France have signed an MoU for the construction of six nuclear reactors at Jaitapur in Maharashtra, two months after the two countries decided to conclude the techno-commercial negotiations for the project by the year end. The pact was inked yesterday at the end of the two-day visit of a high-level delegation of Electricite de France (EDF - French public utility) to Mumbai for holding discussions with National Power Corporation of India Ltd (NPCIL) on the construction o...Read More

Leakage in Kakrapar Atomic power station detected immediately: Govt

March 16, 2016

New Delhi The recent "incident" of leakage of a coolant pipe in one of the units of the Kakrapar Atomic Power Station in Gujarat was detected "in a few moments", the government said today. Responding to supplementaries in the Lok Sabha during Question Hour, Minister of State in Prime Minister's Office Jitendra Singh said the leakage, which occured four days ago, was an "incident" and not an "accident". To keep the temperature down, alternative systems came into play when the coolant pi...Read More

GoI statement on Shutdown of Unit-1 of Kakrapar

March 11, 2016

New Delhi This is the official statement issued by the Government of India on Kakrapar Unit-1 leakage from Coolant System: The Unit-1 of Kakrapara Atomic Power Station (KAPS), an indigenous 220 MWe Pressurized Heavy Water Reactor (PHWR) underwent an automatic shutdown today at about 0900 hrs, following an incident of a leak from its coolant system. The safety systems of the reactor have worked as intended, including the backup cooling systems. All the safety functions for the react...Read More

No radiation within or around the plant at Kakrapar: Collector

March 11, 2016

Surat District Collector of Tapi in south Gujarat today interacting to media persons clarified that there was no radiation within or around the Kakrapar Atomic Energy plant today morning as thanks to the inbuilt safety system, the unit shut down automatically after leakage which was negligible. Collector Dr Rajendrakumar further said that the leakage in primary heat transport system of unit-1 has not caused any problem. Core cooling process of reactor is on. Site director is in co...Read More

Shutdown after leakage in PHT system at Kakrapar power station

March 11, 2016

Surat Nuclear Power Corporation of India Limited, a Government of India enterprise today in a statement said that Unit-1 of Kakrapar Atomic Power Station in south Gujarat which was operating at its rated power was shutdown at about 9.00 hours today. The statement further reads, "consequent to a small leak in Primary Heat Transport(PHT) System, the reactor was shut down as intended as per design provisions." All safety systems are working as intended. The radioactivity/raditation le...Read More