Gujarat CM dedicates Rs 1677 crore 55 km pipeline at Jasdan under SAUNI project, Ankadia dam overflows
June 09, 2017
Jasdan: Chief Minister Vijay Rupani today inaugurated phase – 1 link – 4 of SAUNI project by welcoming Narmada waters at Ankadia village of Jasdan belt in Rajkot district.
A 55 km pipeline dedicated today connects Bhogavo – 2 dam to Ankadiya dam of Sartanpar in Jasdan belt. Rs 1677 crore pipeline is 55 km long. Panchal area of Saurashtra is source of most of the reservoirs of this region. Ankadia dam has seen overflow for the first time today after two and half decades, thanks to Narmada water and SAUNI project. So far 21 dams, 48 talavs and 174 check dams have been filled with Narmada water through SAUNI project.
The Chief Minister on this occasion announced that Prime Minister Narendra Modi will come to Rajkot and inaugurate phase-1 of link-3 of SAUNI project on June 29.
SAUNI is the project to divert floodwaters of Narmada to 115 dams of parched Saurashtra region through a pipeline network. With today’s programme, the first phases of three out of total four link pipeline canals of SAUNI project have been inaugurated within a year. Each pipeline link of total Rs 16,500 crore SAUNI project has been divided into three phases. Total length of pipeline network is 1125 km.



DeshGujarat
Related Stories
Recent Stories
- 3 workers die of gas leak while cleaning sewage tank in Ahmedabad factory
- Major fire engulfs over 10 shops at Awadh Rituraj Textile Hub in Surat
- Gujarat Police nabs Bihar man from Jalandhar in cyber fraud case; ISI link emerges
- Valsad Police nabs one for ‘anti-national’ post on Operation Sindoor
- 2 flyovers to be built in Ahmedabad for ₹379 crore; Amit Shah to lay foundation stone
- AMC to give free trees to societies via upcoming online portal
- Navsari man shares deepfake video of PM Modi in WhatsApp group; held