Alstom India hands over first Trainset for Meerut Metro to NCRTC at Savli in Gujarat

Vadodara: The First Look of the Meerut Metro train set was unveiled today as the first train set was handed over to NCRTC at Alstom manufacturing plant at Savli near Vadodara in Central Gujarat.

Alstom India was awarded the manufacturing contract, under which they will deliver 10 three-car train sets for the Meerut Metro, bundled with rolling stock maintenance for 15 years.

The train sets, with their sleek and modern design, will be energy efficient, lightweight and equipped with a regenerative braking system, compatible with Automatic Train Protection (ATP), Automatic Train Control (ATC), and Automatic Train Operations (ATO). The Metro train has a maximum operational speed of 120 kmph.