More curves straightened to increase the speed of trains
May 01, 2024
Godhra: Under its Mission Raftar to elevate the speed of trains upto 160 km/h, Western Railways has straightened yet another curve on Godhra – Nagda section. In this section, so far four curves are realigned and straightened. With this, the speed of trains will go up to 130 km/h from existing 80-95 km/h. Apart from track realignment, the Railways has done bridge maintanance, track side fencing, GE(permanent speed restriction), signal to change the sleepers and electric works. The fencing work is still going on. DeshGujarat
Recent Stories
- Smritivan Earthquake Memorial of Kutch Awarded at UNESCO's 2024 Prix Versailles
- Khel Mahakumbh 3.0 to be held from 5th Dec 2024 to 31st Mar 2025 in Gujarat
- Explosion at Detox India Pvt. Ltd. in Ankleshwar claims four lives
- Flying knives: Surat youth dies after kite string slashes his throat on overbridge
- IFFCO starts exporting Nano Urea to Sri Lanka, Nepal, Bhutan, and Brazil
- ACB Gujarat nabs Dy. Mamlatdar-cum-Circle Officer for accepting bribe
- Gujarat recorded over 9.53 lakh animals in 2023; attracted 18–20 lakh migratory birds in 2024