MGVCL cuts off power supply to Savli Municipality over unpaid dues
March 20, 2025
Vadodara : The roads in Savli Municipality in Vadodara district witnessed darkness as the Madhya Gujarat Vij Company Limited (MGVCL) cut off the power connection due to unpaid bills. MGVCL disconnected the power supply to streetlights due to an overdue bill of Rs. 3.43 crore. The power was cut to the Savli Municipality office and streetlights in several areas.
Out of the Rs. 3.43 crore unpaid bill, Rs. 83 lakh is for streetlights, Rs. 1.9 crore is pending in the waterworks department, and Rs. 69 lakh is due from the commercial department.
It has come to light that from 2019 to 2023, Savli Municipality has only paid Rs. 7.9 lakh in installments. MGVCL restored the power after assurances were given that the bill would be paid within a week. DeshGujarat
Recent Stories
- How City-Wise Traffic Portals Are Changing Fine Payments in India
- 19-Year-Old Biker Dies After High-Speed Crash in Vadodara; CCTV Footage Goes Viral
- Woman Hangs from 10th Floor of Rajkot Building; Dramatic Video Goes Viral
- Gujarat to Host 3rd Edition of Semiconnect Conference 2026 at Mahatma Mandir
- Dumas Sea-Face Project Phase 1 Likely to Open on March 8
