Akota – Dandia Bazar solar bridge project likely to complete in a month
December 17, 2020
Vadodara: Solar panel laying work over Akota – Dandiya Bajar bridge in Vadodara has been comleted. The entire project will be completed in next one month after installation of compact substation is over. In all, 3,024 solar panels have been laid over this 220 meter long bridge. Expected generation of power through this arrangement will be 3,000 to 4,000 units per day and 14.35 lakh units annually that may result into saving of Rs. 1 crore power bill for Vadodara Municipal Corporation (VMC). A 983 kw capacity solar generation facility has been set up at a cost of Rs. 11.36 crore. VMC will transfer solar power generated to Madhya Gujarat Vij Company Ltd (MGVCL) and get rebate on MGVCL electricity bills. DeshGujarat
Related Stories
A solar bridge in Vadodara generates Rs. 50 lakh worth power in 9 months
Vadodara gets rooftop solar power plant over Akota - Dandiya Bazar bridge
Recent Stories
- 45 royals of Gujarat extend support to Narendra Modi ahead of Lok Sabha Polls
- PM Modi in Jamnagar to campaign for BJP in Lok Sabha polls 2024
- Rapido to offer free ride to home after voting to voters in Gujarat on 7th May
- PM Modi in Junagadh for BJP Lok Sabha Polls 2024 Campaign
- Blast in parcel leaves 2 dead and 2 injured in Vadali
- Reliance Retail's Tira Beauty Unveils New Private Label Brand: ‘Nails Our Way’
- Lok Sabha Polls 2024: PM Modi campaigns for BJP in Surendranagar