False claim about faulty design of new flyover in Surat debunked
November 09, 2023
Surat: Several news reports have been circulating since Wednesday after a video of a new flyover built in the Kalakunj area here in the city went viral on social media. The video showed that a bus couldn’t turn on the newly inaugurated bridge and was stuck there allegedly because of its faulty design.
Posting the video of the narrow bridge, showing that a state transport bus cannot turn on it, Gujarat Congress on its Twitter account wrote, “New deed of BJP government! Have you ever seen such development? Even the government bus cannot turn on the new bridge!”
New view of BJP government!
Have you ever seen such a development?
Even the government bus cannot turn in the new bridge! pic.twitter.com/amgWSGuFok— Gujarat Congress (@INCGujarat) November 8, 2023
However, the reality of the video turned out to be different, as the flyover is not designed for the movement of heavy vehicles. It was the fault of the driver who took that flyover even when there was a signboard on the flyover prohibiting the entry of buses and trucks.
The signboard on the bridge clearly states that entry is prohibited for vehicles over 7.5 meters in length.
This false narrative about the wrong design of the bridge went viral on social media until citizens themselves disputed the false claim, calling out the myth. DeshGujarat
Recent Stories
- Diwali Food Safety Drive: AMC Seals Two Units, Fines Four Outlets ₹40,000
- HDFC Bank Gets Govt Nod to Offer Deposits Under Capital Gains Accounts Scheme
- GSSSB Announces Recruitment for 1,237 Class-3 Posts; Applications Open on November 5
- AMC to Hike Parking Fees; Proposed New Rates Here
- Mumbai Mayor Ritu Tawde Meets Gujarat CM Bhupendra Patel
- Holiday Inn Resort to Come Up in Sasan Gir
