CM Bhupendra Patel inaugurates Ranasan railway overbridge
December 25, 2023
Gandhinagar: Gujarat Chief Minister Bhupendra Patel inaugurated the newly built railway overbridge at Ranasan Junction today.
With the opening of this Ranasan flyover, completed at a cost of Rs. 60.79 crores by the Ahmedabad Urban Development Board (AUDA), the traffic load from Surat and Saurashtra on Sardar Patel Ring Road towards Ahmedabad-Mehsana-Himmatnagar will be reduced.
The construction of this overbridge will facilitate the movement of small and large vehicles, including commercial vehicles, on the Sardar Patel Ring Road, saving both time and fuel. DeshGujarat
Recent Stories
- Surendranagar Police Raid Gym, Recover 100s of Photos and Videos of Hindu Women
- Sabarmati Riverfront Phase-II: 82% Work Completed, Entire Phase Expected by December 2027
- Gujarat Govt Buildings Have 95 MW Rooftop Solar Capacity, Another 65 MW Planned This Year
- Surat Airport Expands Use of Renewable Energy
- Bullet Train Bridge over Sabarmati River in Ahmedabad completed
- Kheda Railway Station Gold Robbery Solved Within Hours; ₹4 Crore Gold Recovered, Four Arrested
