GMRC Announces Revised Timetable for Ahmedabad – Gandhinagar Metro Route
September 27, 2025
Gandhinagar: Starting tomorrow, two more stations will open on the Motera Stadium–Sachivalaya Corridor (Yellow Line) of the Ahmedabad–Gandhinagar Metro Rail service. These two stations are Juna Koba and Koba Gam. With the opening of these stations, all stations on the route up to Sachivalaya will be operational. Keeping this in mind, the Gujarat Metro Rail Corporation (GMRC) today shared the revised timetable for the route, which will come into effect from tomorrow, 28th September 2025.
As per the timetable, there will be 28 train trips in both directions. The first train will depart from Motera at 8:11 AM, and the last train will be at 7:32 PM. Meanwhile, from Sachivalaya, the first train will depart at 8:23 AM, and the last train will leave at 7:46 PM. Here is the detailed timetable as shared by GMRC. DeshGujarat
Leave a Reply
Recent Stories
- Gujarat-Cadre IPS Officer Rajiv Ranjan Bhagat Appointed ADG in SPG
- Bank of India Officers Challenge Census Duty Orders in Gujarat High Court
- Temperatures Dip Across Gujarat After Pre-Monsoon Showers; Ahmedabad Records 3.8°C Drop
- Traffic Restrictions, Diversions at Anupam Bridge in Ahmedabad for Bullet Train Work
- Ankleshwar GIDC Gets Rs 32-Crore Transport Nagar
- Mumbai - Ahmedabad Bullet Train Project: Third Mountain Tunnel Breakthrough Achieved in Maharashtra
